Marek from Kyogle NSW

Posted on 17/03/2010 by pasha

"Should be able to get the third coat before 72 hours. The second coat went on nearly a week after the first coat and got wet after about 12 hours of finishing as we were not expecting rain at all. Then it pissed down for about 4 days solid! I was getting worried I tell you as I had not got it together to cover the area. But when the sun came out again I checked it out and it hanged in there. I was very impressed. Could not even scratch it off much with a nail. So obviously it "took" even after getting saturated for four days. Looks like an amazing paint that's for sure. Re the Epotec DIY process from your info. No problems. Info was fine. Easy to follow and adequately detailed. Looking forward to filling the pool soon and start enjoying...... Regards "

If you would like to purchase our product on line:
EPOTEC Supplied by:
Hitchins Technologies P/L,
ABN 17 119 448 501,
PO Box 3186, Bonnells Bay,NSW 2264 ,
Ph: 1300 88 79 20, Fax: 1300 88 79 21
All Transactions will be processed by  HITCHINS TECHNOLOGIES PTY LTD